| Now for the Loading Arm Information
Number of Arms:
Loading or Unloading: Loading , Unloading , Both
Pipe Size: 2" , 3" , 4" , 6" , Other
Flow Rate: GPM
Pressure: Positive , Negative
Product to be handled:
Product temperature:
Dry Line: Yes , No
Is a vapor and/or purge line require: Yes , No
Please describe:
Required Method: Tight Fill , Splash Fill , Suction
Other
If tight fill, what type of connection is required:
Flanged , Union , Vapor Cone , Vapor Plate , Coupler/Adapter
Other
Where applicable describe existing loading/unloading equipment
Loading arm metal material:
Swivel joint seal material:
Which side of the island are the arms to be used: One Side , Both Sides
Number of truck connections:
Distance between each connection:
Connection location: Side of the truck , Back of the truck
Connection Type: API Coupler , Other:
Compartments loaded at one time without moving the truck:
Number of product risers:
Distance between risers (center to center):
Risers are: Flanged , Threaded
Now for the Loading Arm Location
Using the diagram on the right, please complete the appropriate dimensions:
Connections to be made at the following points:
1 , 2 , 3 , 4 , 5 , 6
If more than one connection is required,
Distance between connections
Connection Sequence:
I. Riser (drop feed) height
J. Riser (horizontal)
K. Riser (up feed)
L. Center (riser to tank car)
M. Connection height (top)
N. Connection height (bottom)
Additional Considerations
Distance between risers
Risers are: 150# flanged , 300# flanged , Threaded , Other .
Distance between ground and truck
Distance of closest obstructions:
Safety Rail
Canopy
Piping
Support Beam
Other
That's it!
Hit submit and one of our Loading Arm advisors will go to work for you!
|